Bathroom Remodeling on a Whim: Part 2

Maker:0x4c,Date:2017-11-28,Ver:4,Lens:Kan03,Act:Lar01,E-veThe reason I started doing handyman work and woodworking in Waukee was because I hate sitting behind a computer. The reason I’m slow to update my blog is because I hate sitting behind a computer. Notice a trend? The bathroom has been complete for almost a month and I still haven’t gotten around to Part 2. Check out Part 1, where I impulsively dove into this remodel.

Here goes.

For the remodel once I started getting, the Lady Friend came home and we picked out (read she picked out) the new fixtures. The only thing not getting replaced was the toilet. (seriously though, unless it’s a gaudy style, those things should last a century or more)

Once we got back from the store, it was decided some relaxation was in order after patching nail holes and starting the texture on the walls.

For those of you who don’t know what texture is, it’s the bumps or random patterns on your walls. If you have scratches on the wall, poor painting or drywall work but the purpose of the texture is to provide some depth and hide defects in the walls. Even the best done walls will have waves or bits were the installers weren’t perfect so the texture gracefully hides those imperfections. Maybe I’ll do some more research into it and do an article on it. Also, I’ll have more on texturing when I get around to writing up my recent painting.  Here is an example of a wall without and a wall with texture:

After a good night’s sleep and a delicious breakfast, demolition continued with the sink, vanity top and cabinet removal. That left me with nothing but the toilet and lineolium floor. I left them both because I wasn’t sure if I wanted to mess with them or not. I’d later rue my hesitency.

Painting of this beautiful light blue began. We chose Dutch Boy semi-gloss mostly because it was on sale and I love their twist off lids and easy pour can.

Maker:0x4c,Date:2017-11-28,Ver:4,Lens:Kan03,Act:Lar01,E-ve

After paint I moved onto flooring. For that, we chose laminate because of price and ease of installation. I’ve done tile before and without an actual tile saw, it becomes a bigger hassle than it is worth (and I don’t feel like spending a few hundred bucks for a nice wet saw). Oftentimes, when going over linoleum floor, it is easier and just as durable to go directly over the floor rather than removing the linoleum since often linoleum is glued down to the substrate everywhere.

The builders left a cutout where the old vanity was and upon inspection, there was some extra plywood the linoleum was glued to so off it all went which meant the toilet had to go as well. This is the moment where I figured out, I should have just done it to begin with. Would have made painting and texturing and working in a small space a hundred times easier. Well, something to be learned on each job.

Under the toilet was gross as hell. The wax ring had hardened slightly and years of kids missing the toilet left it smelling of piss. But I went to Menards over in Clive and got a new ring (this one made of foam, we’ll see how it holds up (but it is far cleaner to install)) for the toilet.

Maker:0x4c,Date:2017-11-28,Ver:4,Lens:Kan03,Act:Lar01,E-ve

Called it a night at that point. It was 10:00 at night and I was tuckered but only the vanity, mirror and lights were left to install. Sunday’s installs will be in another post.

Maker:0x4c,Date:2017-11-28,Ver:4,Lens:Kan03,Act:Lar01,E-ve
That odd shaped spot is behind the water closet. It’s invisible when the toilet is in and gives a neat history of the paint done. Next time, just remove the toilet right away.
Remodeling

Bathroom Remodeling on a Whim

IMG_20180210_112845_440.jpg

Last summer, I purchased a home in a local suburb with the idea of getting an out-

of-date house, doing some work over the years and selling it when the kids got older for more than what I put into it.  What I didn’t realize, was how many rooms of the same house could smell like piss when doing renovation and not have a general piss smell throughout the whole house.

The Lady Friend and I have been discussing doing some extra work around the home instead of solely working in my dungeon workshop. I redid the floor in a couple of the closets last fall, the deck last summer and the living room prior to Thanksgiving (minus flooring).  This time, the bathroom was next up on the docket for remodeling, even if neither her nor I knew it last Thursday.

The bathroom wasn’t bad, it just screamed builder-grade, late-90’s (even though the house was built in 2004), and a desperate home-owner that hadn’t done a thing to a house in 11 years trying to salvage some resale value through sloppy updates (side note: it didn’t work).

Thankfully, they didn’t touch the bathrooms much outside of hurried paint jobs.  This is good as everything else I have fixed in the house has all been their work (my god, how do you manage to screw up laminate floor).  Unfortunately, I’ve been forced to live with a God-awful pee-yellow bathroom since June 2017.  Last weekend, that all changed.

Over the next few weeks, I’ll be detailing out my process on remodeling the bathroom, including what I did, why I did it and how much stuff I messed up (not a ton (spoiler: it’s mostly that I didn’t take enough before pictures), but it’s only a 30 square foot room).

Next up will be the extensive planning that I didn’t do.